Concrete calculator: cement bags, sand and ballast

Set the size of a slab, footing, column or beam and choose a nominal mix: the concrete volume, bags of cement, sand, ballast and water are worked out by the dry-volume method.

Works in metric or imperial units.

Free for schools, teachers and blogs.
Put this model on your website, blog or class page
Size:
Copied
  • Google Sites: Insert → Embed → Embed code, and paste.
  • WordPress: add a "Custom HTML" block and paste.
  • Blogger: in the post, switch to HTML view and paste.
  • Free to use as long as the link under it stays.

Learn concrete properly

StudyAI writes clear notes on any topic you study, with practice quizzes, past-paper questions explained, and interactive models like this one in the notes.

Get free notes and a quiz on this
Free to start. No card needed.

Questions students ask

How many bags of cement are in a cubic metre of 1:2:4 concrete?

About 6.3 bags of 50 kg: dry volume 1.54 m³, one seventh of it cement, at 1440 kg/m³.

Why multiply by 1.54?

Dry materials shrink in volume when mixed with water and compacted, so about 54% more dry material is needed than the volume of wet concrete.

Free notes on concrete

More civil engineering tools

All interactive tools