Rational method: peak runoff

Set the rainfall intensity, catchment area and surface type to see the peak runoff.

Works in metric or imperial units.

Learn rational method properly

StudyAI writes clear notes on any topic you study, with practice quizzes, past-paper questions explained, and interactive models like this one in the notes.

Get free notes and a quiz on this
Free to start. No card needed.

Questions students ask

What is the time of concentration?

The time for rain on the furthest point of the catchment to reach the outlet. Use a storm of that length for the intensity.

What formula does it use?

Q = CiA/360 (Q in m³/s, i in mm/h, A in hectares).

Free notes on rational method

More civil engineering tools

All interactive tools
Use this on your own site or class page

Copy this code. It is free to use, as long as the link stays.